Subpart R- Inputs Form

Changed

Last updated: 1 month ago

Please see Reporting Form Instructions on downloading the blank inputs form and uploading the completed inputs form.

The equation inputs for Subpart R are listed below. Enter the inputs on the appropriate tab(s) in the inputs form and save the file to your computer.

Subpart R- Lead Production

Fill out the Lead Production inputs:

1) Facility Information

  • Facility Name
  • GHGRP ID
  • Reporting Period
  • Comments (optional)
Subpart R: Facility Information

2) Equation R-1 Inputs

  • Name of Each Carbon-Containing Material Fed, Charged, or Otherwise Introduced to a Smelting Furnace (from Reporting Form)
  • Smelting Furnace Associated with Feedstock (from Reporting Form)
  • Feedstock Type
  • Annual Mass of Feedstock Charged to the Smelting Furnace (tons)
  • Carbon Content of the Feedstock from the Carbon Analysis (percent by weight, expressed as a decimal fraction)
Subpart R: Equation R-1 Inputs