Skip to main content
Home
  • Home
    • Basic User Registration
    • Electronic Signature Agreement
    • User Profile
    • Login.gov Migration Process
    • System Requirements
    • About Facility Registration
    • Accessing an Already Registered Facility
    • Appointing the DR, ADR, and Agents
    • Acceptance of DR and ADR Appointment
    • Acceptance of Agent Appointment
    • Notice of Delegation
    • About e-GGRT Data Reporting Tab
    • Preparing Your Annual GHG Reporting
    • How to Submit an Annual Report
    • Subpart Reporting Instructions
    • Reporting Forms
    • Optional Calculation Spreadsheets
    • XML Reporting Instructions
    • About the Inputs Verifier Tool
    • e-GGRT
    • Rule Subparts
    • XML Reporting
    • GHGRP Data and Publication

Subpart W - BAMM

Breadcrumbs

FAQs, Rule Subparts, Subpart W. Petroleum and Natural Gas Systems

Changed

Last updated: 1 day ago

Subpart W - BAMM

  • Q450. Can I use BAMMs beyond December 31, 2011 for subparts I, L and W?
  • Q765. How do I determine “actual” temperature and pressure in emission calculations?
  • Q766. What are the requirements for determining the GHG mole fraction for emission calculations when a continuous gas composition analyzer is not available?
  • Q767. What are the requirements for determining the volume of gas sent to a flare?
  • Q768. What types of instruments are permissible for use in detecting equipment leaks and through valve leakage in Subpart W?
  • Q769. If a facility does not have a GOR value for a well, what options are available to facilities in order to determine GOR for associated gas venting and flaring?

 

Return to top
  • e-GGRT
  • Help
  • FAQ
  • FLIGHT
  • GHGRP
Back to top